Loan Agreement Between India and International Bank for Reconstruction and Development (Odisha State Capability and Resilient Growth Program-12/07/2023)

Photo By: Deborah W. Campos, World Bank

AGREEMENT dated as of the Signature Date between INDIA (โ€œBorrowerโ€) and INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT (โ€œBankโ€). The Borrower and the Bank hereby agree as follows
LOAN NUMBER 9484-IN

DATE:12/07/2023


Loan Agreement (Odisha State Capability and Resilient Growth Program)



                       between


                       INDIA


                         and


INTERNATIONAL BANK FOR RECONSTRUCTION
           AND DEVELOPMENT
                                               -1-



                                     LOAN AGREEMENT

      AGREEMENT dated as of the Signature Date between INDIA (โ€œBorrowerโ€) and
INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT (โ€œBankโ€). The Borrower and the Bank hereby agree as follows:

                 ARTICLE I โ€” GENERAL CONDITIONS; DEFINITIONS

1.01.   The General Conditions (as defined in the Appendix to this Agreement) apply to and form
        part of this Agreement.

1.02.   Unless the context requires otherwise, the capitalized terms used in this Agreement have
        the meanings ascribed to them in the General Conditions or in the Appendix to this
        Agreement.

                                    ARTICLE II โ€” LOAN

2.01.   The Bank agrees to lend to the Borrower the amount of one hundred million Dollars ($
        100,000,000), as such amount may be converted from time to time through a Currency
        Conversion (โ€œLoanโ€), to assist in financing the program described in Schedule 1 to this
        Agreement (โ€œProgramโ€).

2.02.   The Borrower may withdraw the proceeds of the Loan in accordance with Section IV of
        Schedule 2 to this Agreement. All withdrawals from the Loan Account shall be deposited
        by the Bank into an account specified by the Borrower and acceptable to the Bank.

2.03.   The Front-end Fee is one quarter of one percent (0.25%) of the Loan amount.

2.04.   The Commitment Charge is one quarter of one percent (0.25%) per annum on the
        Unwithdrawn Loan Balance.

2.05.   The interest rate is the Reference Rate plus the Variable Spread; or such rate as may apply
        following a Conversion; subject to Section 3.02(e) of the General Conditions.

2.06.   The Payment Dates are March15 and September15 in each year.

2.07.   The principal amount of the Loan shall be repaid in accordance with Schedule 3 to this
        Agreement.


                                 ARTICLE III โ€” PROGRAM

3.01.   The Borrower declares its commitment to the objective of the Program. To this end, the
        Borrower shall cause the Program to be carried out by the Program Implementing Entity
        in accordance with the provisions of Article V of the General Conditions, Schedule 2 to
        this Agreement and the Program Agreement.
                                                -2-



                   ARTICLE IV โ€” EFFECTIVENESS; TERMINATION

4.01.   The Effectiveness Deadline is the date ninety (90) days after the Signature Date.

                    ARTICLE V โ€” REPRESENTATIVE; ADDRESSES

5.01.   The Borrowerโ€™s Representative is any of the following officials acting severally: the
        Secretary, Additional Secretary, Joint Secretary, Director, Deputy Secretary, or Under
        Secretary of the Department of Economic Affairs of the Borrowerโ€™s Ministry of Finance.

5.02.   For purposes of Section 10.01 of the General Conditions:

        (a) the Borrowerโ€™s address is:
           Secretary, Department of Economic Affairs
           Ministry of Finance
           Government of India
           North Block, New Delhi 110 001, India; and

        (b) the Borrowerโ€™s Electronic Address is:

           Facsimile:           E-mail:
           +91-11-23094075      secy-dea@nic.in

5.03.   For purposes of Section 10.01 of the General Conditions: (a) the Bankโ€™s address is:

        International Bank for Reconstruction and Development
        1818 H Street, N.W.
        Washington, D.C. 20433
        United States of America; and

        (b) the Bankโ€™s Electronic Address is:

        Telex:                  Facsimile:               E-mail:

        248423(MCI) or          1-202-477-6391           wbindia@worldbank.org
         64145(MCI)
                                        -3-



AGREED as of the Signature Date.


                                   INDIA


                                   By

                                        _____________________________________/s1/

                                                           Authorized Representative
                                                     K. Manicka Raj
                                              Name: __________________________/n1/
                                                     Joint Secretary, FB&ADB
                                               Title: __________________________/t1/
                                                    14-Jul-2023
                                               Date: __________________________/d1/


                            INTERNATIONAL BANK FOR                                      RECONSTRUCTION AND DEVELOPMENT


                                   By

                                        _____________________________________/s1/

                                                           Authorized Representative
                                                    Auguste Tano Kouame
                                              Name: __________________________/n1/
                                                     Country Director
                                               Title: __________________________/t1/
                                                     12-Jul-2023
                                               Date: __________________________/d1/
                                                -4-



                                         SCHEDULE 1

                                      Program Description


        The objective of the Program is to protect poor and vulnerable households from the impact
of economic and climate shocks in Odisha.

        The Program consists of the following activities:

Results Area 1: Increasing Social Protection Coverage through Adaptive Delivery Systems

1.1     Development and adoption of a Social Protection Delivery Platform (SPDP) to enable
        increased coverage and consolidated delivery of core safety nets to vulnerable and poor
        households through digitized mechanisms.

1.2     Integration of SPDP with disaster alerts and urban municipal points of access to improve
        resilience in disaster prone regions and under-served urban areas.

1.3     Development and adoption of State Data Policy, to protect citizen privacy, and standardize
        the process of digitization, storage and sharing of data within different departments of the
        state, as well as sharing of data in public domain to facilitate effective and transparent
        governance.


Results Area 2: Strengthening Statistical Systems for Better Planning and Resilience

2.1     Support for introduction and adoption of digital technologies, including:

        (a)     Supporting DES to transition to computer assisted personal interviewing
                technology;

        (b)     Building capacity of DES to increase user engagement in statistical activities and
                filling key data gaps needed for policy and monitoring of schemes and services,
                including data for key state indicators;

        (c)     Developing a digital platform for survey data collection;

        (d)     Developing a data warehouse for official survey micro-data and time-series data
                for key state statistical indicators, and a revamped website to provide end-users
                with advanced queries and the extraction of the desired data; and

        (e)     Supporting development and adoption of policies, including data dissemination
                and quality assurance policies.
                                              -5-




Results Area 3: Reducing Losses by Strengthening Disaster Management Systems

3.1    Strengthening of technical and institutional capacity of OSDMA to enhance systems and
       processes on disaster preparedness and response.

3.2    Strengthening of community disaster management planning and implementation by:

       (a)     Developing risk-informed Village Disaster Management Plans (VDMPs) which
               use good quality data for planning and identifying actionable resilience actions;

       (b)     Developing risk-informed Gram Panchayat Disaster Management Plans
               (GPDMPs) which identify actionable resilience actions; and

       (c)     Integrating actions identified in the GPDMPs with Gram Panchayat development
               planning processes.

3.3    Strengthening of human resource and organizational capacities of OSDMA.

3.4    Operationalization of the State Institute for Disaster Management (SIDM), including
       developing a business plan, hiring of staff, and setting up the education delivery system.
                                                -6-



                                         SCHEDULE 2

                                       Program Execution

Section I.      Implementation Arrangements

A.      Institutional Arrangements

1.      To facilitate the carrying out of the Program, the Borrower shall make the proceeds of the
        Loan available to the Program Implementing Entity in accordance with the Borrowerโ€™s
        standard arrangements for developmental assistance to the states of India. Notwithstanding
        the foregoing, in the event that any provision of this Agreement, including the instructions
        that the Bank shall have specified by notice to the Borrower pursuant to Section IV.A of
        this Schedule 2, were to be found inconsistent with the Borrowerโ€™s standard arrangements
        for development assistance to the states of India, the provisions of this Agreement and
        related instructions shall govern.

2.      The Borrower shall at all times protect its own interests and the interests of the Bank to
        accomplish the purposes of the Loan.


B.      Program Action Plan

        The Borrower shall cause the Program Implementing Entity to implement the Program
        Action Plan, in accordance with the provisions of Section I.C of the Schedule to the
        Program Agreement.

Section II.     Excluded Activities

        The Borrower shall ensure that the Program excludes any activities which:

        A.      in the opinion of the Bank, are likely to have significant adverse impacts that are
                sensitive, diverse, or unprecedented on the environment and/or affected people; or

        B.      involve the procurement of: (1) works, estimated to cost USD75,000,000
                equivalent or more per contract; (2) goods, estimated to cost USD50,000,000
                equivalent or more per contract; (3) non-consulting services, estimated to cost
                USD50,000,000 equivalent or more per contract; or (4) consulting services,
                estimated to cost USD20,000,000 equivalent or more per contract.

Section III.    Program Monitoring, Reporting and Evaluation

        The Borrower shall cause the Program Implementing Entity to furnish to the Bank each
        Program Report not later than forty-five days after the end of each calendar semester,
        covering the calendar semester.
                                                    -7-



Section IV.        Withdrawal of Loan Proceeds

A.         General

1.         Without limitation upon the provisions of Article II of the General Conditions and in
           accordance with the Disbursement and Financial Information Letter, the Borrower may
           withdraw the proceeds of the Loan to: (a) finance Program Expenditures (inclusive of
           Taxes), on the basis of the results (โ€œDisbursement Linked Resultsโ€ or โ€œDLRsโ€) achieved
           by the Program Implementing Entity, as measured against specific indicators
           (โ€œDisbursement Linked Indicatorsโ€ or โ€œDLIsโ€); and (b) pay: (i) the Front -end Fee; and
           (ii) pay each Interest Rate Cap or Interest Rate Collar premium; all as set forth in the table
           in paragraph 2 of this Part A and Schedule 4 to this Agreement.

2.         The following table specifies each category of withdrawal of the proceeds of the Loan
           (including DLIs as applicable) (โ€œCategoryโ€), and the allocation of the amounts of the Loan
           to each Category; provided that for the purpose of Categories (1) to (9) of the table below,
           the actual amount authorized for disbursement (โ€œAllocated Amountโ€) based on the formula
           for its determination upon the achievement of an individual DLR for any given DLI
           financed under such Category, shall be calculated as set forth in Schedule 4 to this
           Agreement:

                                 Category                                            Amount of the
           (including Disbursement Linked Indicator as applicable)                       Loan
                                                                                       Allocated
                                                                                     (expressed in
                                                                                         USD)
     (1) DLI #1: Strengthening standardization and improving quality of data           9,750,000
         sets in select two departments through adoption of the guidelines of
         the State Data Policy and documentation for future adoption

     (2) DLI #2: Development and Implementation of Social Protection                   16,000,000
         Delivery Platform (SPDP) for enhanced coverage and resilience



     (3) DLI #3: Strengthening resilience through i) deployment of early               11,500,000
         warning dissemination technology systems, and ii) expanded citizen
         outreach

     (4) DLI #4: Improving digital access and management of data for                    6,000,000
         evidence-based policy making and planning

     (5) DLI #5: Implementation of computer assisted survey technology                 11,500,000
         (CAPI) for improved data quality and data production in the state

     (6) DLI #6: Strengthening data production in the state for enhanced                7,500,000
         analytics for evidenced based policy making
                                                  -8-



     (7) DLI #7: Strengthening disaster-related impact forecasting systems for      32,000,000
         improved response and coverage of early warnings alerts

     (8) DLI #8: Population covered (%) by risk-informed Gram Panchayat                2,000,000
         Disaster Management Plans (GPDMP) that are integrated with
         development programs at the Gram Panchayat levels

     (9) DLI #9: Enhancing disaster risk management and disaster education             3,500,000
         capabilities through skilled human resource and facilities

     (10) Front-end Fee to be paid pursuant to Section 2.03 of this Agreement          250,000
         in accordance with Section 2.05 (b) of the General Conditions

     (11) Interest Rate Cap or Interest Rate Collar premium to be paid pursuant           0
         to Section 4.05 (c) of the General Conditions


 TOTAL AMOUNT                                                                      100,000,000



B.         Withdrawal Conditions; Withdrawal Period

1.         Notwithstanding the provisions of Part A of this Section, no withdrawal shall be made:

           (a)     on the basis of DLRs achieved prior to the Signature Date; or/and

           (b)     for any DLR, until and unless the Borrower has furnished evidence satisfactory to
                   the Bank that said DLR has been achieved.

2.         Notwithstanding the provisions of Part B.1(b) of this Section, if any of the DLRs under
           Category (1) to (9) has not been achieved by the date by which the said DLR is set to be
           achieved, the Bank may, by notice to the Borrower:

           (a) authorize the withdrawal of such lesser amount of the unwithdrawn proceeds of the
               Loan then allocated to said Category which, in the opinion of the Bank, corresponds
               to the extent of achievement of said DLR, said lesser amount to be calculated in
               accordance with the formula for Allocated Amounts set out in table in Schedule 4 to
               this Agreement;

           (b) reallocate all or a portion of the proceeds of the Loan then allocated to said DLR to
               any other DLR;

           (c) cancel all or a portion of the proceeds of the Loan then allocated to said DLR; and/or

           (d) authorize the withdrawal of such portion of the Allocated Amount which has not been
               disbursed by the expected date pursuant to paragraph (a) immediately above, at a later
               than the expected date for the DLR(s) achieved after such initially expected date.

3.         The Closing Date is April 26, 2028.
                                              -9-



                                        SCHEDULE 3

                  Commitment-Linked Amortization Repayment Schedule

The following table sets forth the Principal Payment Dates of the Loan and the percentage of the
total principal amount of the Loan payable on each Principal Payment Date (โ€œInstallment Shareโ€).

                                  Level Principal Repayments
          Principal Payment Date                        Installment Share
 On each March15 and September 15
        Beginning September 15, 2026
        through March 15, 2035                                5.26%

 On September 15, 2035                                              5.32%
                                                                                     -10-




                                                                              SCHEDULE 4

                            Disbursement-Linked Indicators, Disbursement-Linked Results and Allocated Amount(s)*


                                                                                 Disbursement-Linked Results (DLRs)
                                                 (Year of Achievement of the DLRs are indicative except when expressly indicated as โ€œTime -boundโ€)
Disbursement-Linked
                               Results to be Achieved in        Results to be Achieved   Results to be Achieved  Results to be Achieved Results to be Achieved in
Indicators (DLIs)
                                  FY2023-24 (Year 1)            in FY2024-25 (Year 2)          in FY2025-26           in FY2026-27                  FY2027-28
                                                                                                  (Year 3)                (Year 4)                    (Year 5)
DLI #1 Strengthening        State data steering committee      Operational guidelines    Training of at least 75 At least two select        OCAC has published the
standardization and         and data governance committee and checklist to support       percent (out of 272)    departments are            report on the lessons learnt
improving quality of data   established and notified; and      implementation and        officials in two select compliant with the State from the implementation
sets in select two          requisite revision and re-         adoption of State Data    departments for the     Data Policy                of State Data Policy in two
departments through         notification of State Data         Policy developed by       adoption of State Data                             select departments
adoption of the             Policy completed                   DoF                       Policy completed
guidelines of the State
Data Policy and
documentation for future
adoption
Allocated Amounts ($)                 $1,000,000                      $1,750,000             $2,000,000 for training                                        $1,000,000
                                                                                              of 55% officials, plus      $1,500,000 for each
                                                                                            $500,000 for every 10%         department that is
                                                                                            increase thereafter, up to   compliant, up to a total
                                                                                                a total amount of        amount of $3,000,000
                                                                                                   $3,000,000
DLI #2 Development and      OCAC has finalized the RFP          OCAC has completed          OCAC has completed a         OCAC has completed a       (i) Coverage of eligible
implementation of SPDP      (Request for Proposal) and has      the integration of SPDP     training and                 training and               households receiving
for enhanced coverage       entered into contract for           for three schemes as per    socialization program        socialization program      KALIA has increased by at
and resilience              onboarding of the system            approved specification      for 60 percent of            for an additional 30       least 10 percent over the
                            integrator for development and      and design                  government officials on      percent of government      baseline of 5,300,000
                            implementation of SPDP with                                     using SPDP                   officials on using SPDP    farmers
                            clearly codified business
                            requirements, functional                                                                                                (ii) Coverage of eligible
                            requirements, system design                                                                                             elderly/ widow/ persons
                            specifications, and roll-out plan                                                                                       with disability under the
                                                                                                                                                    Madhu Babu Pension
                                                                                                                                                    Scheme has increased by
                                                                                                                                                    at least 5 percent over the
                                                                               -11-



                                                                                                                                               baseline of 1,500,000
                                                                                                                                               beneficiaries

                                                                                                                                               (iii) Coverage of
                                                                                                                                               households under the state
                                                                                                                                               government-financed
                                                                                                                                               health insurance scheme
                                                                                                                                               that covers those left out of
                                                                                                                                               national health insurance
                                                                                                                                               scheme has increased by at
                                                                                                                                               least 5 percent over the
                                                                                                                                               baseline of 382,000
                                                                                                                                               households
Allocated Amounts ($)    $2,000,000                       $2,000,000 for              $750,000 for training of     $1,500,000 for training     (a) $1,250,000 for 5%
                                                          intregration of one         50% of officials, plus       of 20% additional           incrase in coverage under
                                                          selected scheme, plus       $25,000 for every            officials over previous     DLR (i) above, plus
                                                          $1,000,000 for              additional percentage        year, plus $100,000 for     $225,000 for every
                                                          integration of every        increase thereafter, up to   every additional            additional percentage
                                                          additional selected         a total amount of            percentage increase         increase thereafter, up to a
                                                          scheme thereafter, up       $1,000,000                   thereafter, up to a total   total amount of $2,375,000
                                                          total amount of                                          amount of $2,000,000
                                                          $4,000,000                                                                           (b) $1,000,000 for 3%
                                                                                                                                               incrase in coverage under
                                                                                                                                               DLR (ii) above, plus
                                                                                                                                               $500,000 for every
                                                                                                                                               additional percentage
                                                                                                                                               increase thereafter, up to a
                                                                                                                                               total amount of
                                                                                                                                               $2,000,000; and

                                                                                                                                               (c) $1,500,000 for 3%
                                                                                                                                               incrase in coverage under
                                                                                                                                               DLR (ii) above, plus
                                                                                                                                               $562,500 for every
                                                                                                                                               additional percentage
                                                                                                                                               increase thereafter, up to a
                                                                                                                                               total amount of $1,125,000
DLI #3 Strengthening     OCAC has completed an            OCAC has published an       (i) OCAC has integrated      (i) At least 100,000        (i) At least 200,000
resilience through (i)   evaluation report on different   RFP (Request For            SPDP and Odisha One          persons are utilizing       persons are utilizing SPDP
deployment of early      information/alert broadcasting   Proposal) to identify a     portal for citizen use       SPDP for data updates       for data updates in rural
warning dissemination    systems at the state level       vendor to develop a cell    across the state; and                                    coastal areas; and
                                                                                    -12-



technological system;                                           broadcasting system        (ii) SPDP services for      in rural coastal areas;
and (ii) citizen outreach                                       with a primary focus on    data updates and            and                         (ii) At least 60,000 persons
                                                                early warning              registration for            (ii) At least 30,000        are utlizing SPDP for data
                                                                information                programs are availabe in    persons are utlizing        updates in urban areas
                                                                dissemination              at least 1500 citizen       SPDP for data updates
                                                                                           service centers, out of     in urban areas
                                                                                           which at least 1000
                                                                                           centers are in rural
                                                                                           coastal areas and at
                                                                                           least 400 centers are in
                                                                                           the urban area
Allocated Amounts ($)       $1,000,000                          $6,000,000                 $750,000 for 1000           $1,850,000 for 120,000      $1,254,000 for 220,000
                                                                                           citizen service centres     persons utlizing SPDP,      persons utlizing SPDP,
                                                                                           offering SPDP services,     plus $15 for every          plus $6.15 for every
                                                                                           plus $1,000 for every       additional person           additional person utilizing
                                                                                           additional citizen          utilizing SPDP              SPDP thereafter, up to a
                                                                                           service centre offering     thereafter, up to a total   total amount of $1,500,000
                                                                                           SPDP services               amount of $2,000,000
                                                                                           thereafter, up to a total
                                                                                           amount of $1,000,000
DLI 4: Improving            Odisha government has issued        DES has completed          DES has published a         DES has established a       All districts in Odisha are
digital access and          a cabinet order to adopt a state-   codifying business         data catalog for core       state data portal and       covered by the DES core
management of data for      wide data dissemination policy      processes, data models,    datasets metadata           launched a core             indicator database,
evidence based policy       based on a web-first policy         data ingestion                                         indicator database to       allowing open data use for
making and planning                                             workflows, and a data                                  improve online data         local planning/action
                                                                migration plan for core                                availability for planning
                                                                datasets to enable the
                                                                implementation of the
                                                                State Data Policy
Allocated Amounts ($)       $1,000,000                          $1,000,000                 $1,000,000                  $1,000,000                  $1,700,000 for 90%
                                                                                                                                                   districts covered, plus
                                                                                                                                                   $10,000 for every
                                                                                                                                                   additional district covered
                                                                                                                                                   thereafter, up to a total
                                                                                                                                                   amount of $2,000,000
DLI#5: Implementation                                           DES has deployed CAPI      DES has completed data      DES has completed data      DES has completed data
of Computer Assisted                                            for survey data            collection for at least 1   collection for at least     collection for at least 1
Survey Technology                                               collection across Odisha   additional core state       one 1 additional core       additional core state
(CAPI) for improved                                                                        survey from previous        state survey from           surveys from previous year
data quality and data                                                                      year done through CAPI      previous year done          done through CAPI
production                                                                                                             through CAPI
                                                                                      -13-



Allocated Amounts ($)                                           $4,000,000                   $2,500,000                  $2,500,000                 $2,500,000
DLI#6: Strengthening       A project management and                                          DES has released at         DES has released at        DES has released at least
data production in the     data analytics unit has been                                      least one new statistical   least new statistical      one new statistical product
state for enhanced         established within the DES to                                     product                     product in addition to     in addition to the products
analytics for evidenced    oversee institutional                                                                         the product released in    released in the previous
based policy making        development, capacity                                                                         the previous year          years
                           building, and incubation of
                           new statistical products
Allocated Amounts ($)                 $2,000,000                                             $2,000,000                  $2,000,000                 $1,500,000
DLI#7: Strengthening       All districts have information       OSDMA has established        OSDMA has established       OSDMA has developed        OSDMA has integrated
disaster-related impact    flows with State Emergency           impact based forecasting     impact based                a state-wide dynamic       SATARK system with
forecasting systems for    Operations Center and                modules for cyclone and      forecasting modules for     multi-hazard risk          modules for impact-based
improved response and      Geospatial Laboratory                storm surge                  for lightning, heat and     assessment                 forecasting, a multi-hazard
coverage of early                                                                            cold wave and               system/platform            risk assessment system,
warnings alerts                                                                              landslides                                             and linkages for all
                                                                                                                                                    districts
Allocated Amounts ($)      $4,700,000 for 90% districts         $5,000,000                   $5,000,000                  $5,000,000                 $400,000 for 90% districts
                           with information flows, plus                                                                                             with linkages, plus
                           $100,000 for every additional                                                                                            $400,000 for every
                           district thereafter, up to a total                                                                                       additional district
                           amount of $5,000,000                                                                                                     thereafter, up to a total
                                                                                                                                                    amount of $12,000,000
DLI 8: 90% population      50 risk informed VDMPs               8 risk informed              (i) Additional 12 risk      8 GPDMPs are               Additional 12 GPDMPs
is covered by risk-        prepared in 8 GPs                    GPDMPs prepared              informed GPDMPs             integrated with the GP     are integrated with the GP
informed Gram                                                   identifying costed and       prepared identifying        development planning       development planning
Panchayat Disaster                                              time-bound resilience        costed and time-bound       process and the village    process and the village
Management Plans                                                actions                      resilience actions; and     resilience tracker         resilience tracker platform
(GPDMP) integrated                                                                                                       platform
with development                                                                             (ii) 51 risk informed
programs at the Gram                                                                         VDMPs prepared in 12
Panchayat levels                                                                             GPs
Allocated Amounts ($)      $40,000 for 40 VDMPs                 $187,500 for 6 GPDMPs        $375,000                    $234,375for 5 GPDMPs       $450,000 for 10 additional
                           prepared; plus $10,000 for           prepared; plus $31,250                                   integrated; plus $46,875   GPDMPs integrated; plus
                           every additional VDMP                for every additional                                     for every additional       $25,000 for every
                           prepared thereafter, up to a         GPDMP prepared                                           GPDMP thereafter, up       additional GPDMP
                           total amount of $500,000             thereafter, up to a total                                to a total amount of       thereafter, up to a total
                                                                amount of $250,000                                       $375,000                   amount of $500,000
DLI 9: Enhancing           OSDMA has notified its first         OSDMA has completed          SIDM has completed a        (i) OSDMA has              OSDMA has established
disaster risk management   strategic long-term human            hiring or deputation of      business plan for           completed the hiring or    an experience and learning
and disaster education     resource plan for improved           technical staff as per the   sustainability and          deputation of staff as     center at SIDM
capabilities through                                                                         capacity building of
                                                                            -14-



 skilled human resource   staffing dedicated to disaster   new human resource      officials in disaster-   per SIDM business plan;
 and facilities           management activities            plan                    management activities    and

                                                                                                            (ii) OSDMA has rolled-
                                                                                                            out four smart classes at
                                                                                                            SIDM allowing more
                                                                                                            coverage of
                                                                                                            stakeholders
 Allocated Amounts ($)    $475,000                         $225,000                $525,000                 $1,550,000                  $725,000


* The periods (Fiscal Years) in which DLRs are expected to be achieved as per this Schedule are for indicative purposes except when otherwise
expressly indicated as โ€œTime-boundโ€. Achievement of DLRs can be obtained earlier or later than said periods up and until the Closing Date;
provided that if any DLR is met prior to the period in which such DLR is indicated for, the Borrower may, with prior agreement of the Bank,
withdraw the amount corresponding to the extent of achievement of said DLR prior to that Fiscal Year indicated in this Schedule.
                                               -15-



                                          APPENDIX

Definitions



 1.    โ€œAllocated Amountโ€ means the amount allocated to each individual DLR, or determined
       for each DLR pursuant to the formula detailed in the table in Schedule 4 to this Agreement,
       as such amount might be increased, reallocated and/or cancelled (whether partially or in its
       entirety) by the Bank, from time to time, as the case may be, in accordance with the
       provisions of Section IV.B.3 of Schedule 2 to this Agreement.

2.     โ€œAnti-corruption Guidelinesโ€ means, for purposes of paragraph 6 of the Appendix to the
       General Conditions, the Bankโ€™s โ€œGuidelines on Preventing and Combating Fraud and
       Corruption in Program-for-Results Financing,โ€ dated February 1, 2012, and revised July
       10, 2015.

3.     โ€œCategoryโ€ means a category set forth in the table in Section IV.A.2 of Schedule 2 to this
       Agreement.

4.     โ€œDESโ€ means the Program Implementing Entityโ€™s Directorate of Economics and Statistics
       under the Planning and Convergence Department, or any successor thereto.

5.     โ€œDisbursement Linked Indicatorโ€ or โ€œDLIโ€ means in respect of a given Category, the
       indicator related to said Category as set forth in the table in Section IV.A.2 of Schedule 2,
       and Schedule 4 to this Agreement.

6.     โ€œDisbursement Linked Resultโ€ or โ€œDLRโ€ means in respect of a given Category, the result
       under said Category as set forth in the table in Schedule 4 to this Agreement, on the basis
       of the achievement of which, the amount of the Loan allocated to said result may be
       withdrawn in accordance with the provisions of said Section IV.

7.     โ€œESSAโ€ means the Environmental and Social Systems Assessment, disclosed on October
       25, 2022, setting forth the description of the Programโ€™s activities, assessing the Program
       Implementing Entityโ€™s environmental and social management systems, detailing the
       Programโ€™s environmental and social benefits, risks and impacts, and recommen ding
       remedial measures to strengthen the social and environmental systems performance.

8.     โ€œFDโ€ means the Program Implementing Entityโ€™s Finance Department, or any successor
       thereto.

9.     โ€œFiscal Yearโ€ or โ€œFYโ€ means the Borrowerโ€™s fiscal year, which begins on April 1 of each
       calendar year and ends on March 31 of the next calendar year.

10.    โ€œGeneral Conditionsโ€ means the โ€œInternational Bank for Reconstruction and Development
       General Conditions for IBRD Financing, Program-for-Results Financingโ€, dated
       December 14, 2018 (revised on August 1, 2020, December 21, 2020, April 1, 2021, and
       January 1, 2022).
                                             -16-



11.   โ€œGeospatial Laboratoryโ€ means a physical laboratory equipped with state -of-the-art
      systems and hardware to use georeferenced information and adopt geospatial data for
      disaster risk management, including risk identification, preparedness, emergency response
      planning and management, post-disaster assessment and recovery planning.

12.   โ€œGram Panchayat Disaster Management Planโ€ or โ€œGPDMPโ€ means a disaster management
      plan prepared by a GP.

13.   โ€œGram Panchayatโ€ or โ€œGPโ€ means a gram panchayat, which is a legally elected local
      government unit, as mandated by the Constitution of India, for local self-governance at the
      village level.

14.   โ€œIFSAโ€ means the Integrated Fiduciary Systems Assessment, setting forth the description
      of the Programโ€™s activities, assessing the Program Implementing Entityโ€™s financial
      management, procurement systems and anti-corruption arrangements, detailing the risks
      and impacts, and recommending remedial measures to strengthen the fiduciary systems.

15.   โ€œIndependent Verification Agentโ€ means the independent entity to be engaged by the
      Program Implementing Entity for the purposes of certifying the achievement of the DLRs
      as referred to in Section III.B of the Schedule to the Program Agreement.

16.   โ€œKALIAโ€ means the Krushak Assistance for Livelihood and Income Augmentation
      program of the government of Odisha under which financial assistance is provided to
      farmers.

17.   โ€œMadhu Babu Pension Schemeโ€ means the Madhu Babu Pension Yojana of the
      government of Odisha, in order to provide social pensions for beneficiaries not covered by
      national social pension schemes.

18.   โ€œOCACโ€ means the Program Implementing Entityโ€™s Odisha Computer Application Centre,
      which is the designated Technical Directorate of the Program Implementing Entityโ€™s
      Department of Electronics & Information Technology, or any successor thereto.

19.   โ€œOdisha One portalโ€ means a comprehensive and transformative effort by the government
      of Odisha to better integrate government-to-citizen services and improve quality of service
      delivery with enriched citizen experience.

20.   โ€œOSDMAโ€ means the Odisha State Disaster Management Authority, registered as a society
      under the Borrowerโ€™s Societies Registration Act of 1860, set up by the government of
      Odisha to undertake disaster management and mitigation activities in Odisha.

21.   โ€œPersonal Dataโ€ means any information relating to an identified or identifiable individual.
      An identifiable individual is one who can be identified by reasonable means, directly or
      indirectly, by reference to an attribute or combination of attributes within the data, or
      combination of the data with other available information. Attributes that can be used to
      identify an identifiable individual include, but are not limited to, name, identification
      number, location data, online identifier, metadata and factors specific to the physical,
      physiological, genetic, mental, economic, cultural or social identity of an individual.
                                             -17-



22.   โ€œPMU-DESโ€ means the unit to be established within DES in accordance with Section I.B.3
      of the Schedule to the Program Agreement.

23.   โ€œPMU-FDโ€ means the unit to be established within FD in accordance with Section I.B.2
      of the Schedule to the Program Agreement.

24.   โ€œProgram Action Planโ€ means the Program Implementing Entityโ€™s plan dated February 6,
      2023 and referred to in Section I.C of the Schedule to the Program Agreement, as may be
      amended from time to time with the agreement of the Bank.

25.   โ€œProgram Implementing Entityโ€ means the Borrowerโ€™s state of Odisha.

26.   โ€œProgram Operations Manualโ€ means the manual to be prepared, approved and adopted by
      the Program Implementing Entity in a manner and substance satisfactory to the Bank
      pursuant to the provisions of Section I.D.1 of the Schedule to the Program Agreement, as
      such manual may be amended from time to time with the prior written concurrence of the
      Bank.

27.   โ€œSATARKโ€ means a system for accessing, tracking and alerting disaster risk information
      based on dynamic risk knowledge developed and adopted by the government of Odisha.

28.   โ€œSignature Dateโ€ means the later of the two dates on which the Borrower and the Bank
      signed this Agreement and such definition applies to all references to โ€œthe date of the Loan
      Agreementโ€ in the General Conditions.

29.   โ€œSocial Protection Delivery Platformโ€ or โ€œSPDPโ€ means a set of technology stack to be
      developed and adopted by the government of Odisha to enable the government to undertake
      informed decisions on scheme implementation and enable seamless targeting and
      identification of beneficiaries.

30.   โ€œSRC Officeโ€ means the Special Relief Commissionerโ€™s office under the Program
      Implementing Entityโ€™s Revenue and Disaster Management Department, or its successor
      thereto.

31.   โ€œState Data Policyโ€ means a policy to be developed and adopted by the government of
      Odisha defining the rules for collection, storage, usage, processing and sharing of Personal
      Data and non-Personal Data, in accordance with the Borrowerโ€™s existing legal framework
      and appropriate international data protection and privacy standards and practices ensuring
      legitimate, appropriate and proportionate treatment of such data.

32.   โ€œState Emergency Operations Centerโ€ means Odishaโ€™s State Emergency Operations
      Center, set up under the administrative and supervisory control of Odishaโ€™s Special Relief
      Commissioner, to support multi-agency and/or multi-jurisdiction disaster response
      coordination and communication.

33.   โ€œState Institute for Disaster Managementโ€ or โ€œSIDMโ€ means the State Institute for Disaster
      Management under OSDMA, established with the objective of providing training and
      promoting research and design, to enable the training of officials to support community
      during times of disasters.
                                            -18-



34.   โ€œVerification Protocolโ€ means the Program Implementing Entityโ€™s protocol, acceptable to
      the Bank, setting forth the means by which the achievement of DLRs will be verified under
      the Program, as such Verification Protocol may be amended from time to time with the
      prior written agreement of the Bank.

35.   โ€œVillage Disaster Management Planโ€ or โ€œVDMPโ€ means a disaster management plan
      created at the village level.

36.   โ€œWRDโ€ means the Program Implementing Entityโ€™s Water Resources Department, or any
      successor thereto.